Index
Page 1
Page 2
Page 3
Page 4
Page 5
Page 6
Page 7
Page 8
Page 9
Page 10
Page 11
Page 12
Page 13
Page 14
Page 15
Page 16
Page 17
Appendix A
Appendix B (p1)
Appendix B (p2)
Appendix B (p3)
Appendix C
Figure 1
Figure 2
Figure 3
Figure 4
Figure 5
Figure 8
Figure 10
Figure 11

CEPS 24

Chief Mechanical & Electrical Engineer's Department Process Specification No. 24
Overhaul And Repair of Smiths Combustion Heater for Diesel Multiple Units

This is the document that works would have used when overhauling heaters. It is quite technical, using test equipment not available to most preservationists, but still a very useful document.

It's dated October 1972, and so doesn't cover many of the variations and alterations. A newer version is the document WOSS 830-4, and many of the drawings will be recognisable from the Smiths Spare Parts book.

The links on the left open jpeg's, use your back button to come back to this page.

Google