           |
Though
very successful in service their alloy construction,
incompatibility with most other units and the many branch
line closures made their early withdrawal along with the
Derby Lightweights inevitable. The first vehicles
withdrawn from service were the LMR batch in July 1967
from Manchester Longsight depot, being broken up during
1968 at the depot's carriage works. The ER units only
survived about a year or so longer most going in 1968
with just a few lasting until the Summer of 1969, the
last allocation being Norwich (NR). |